The entire sports complex is conceived as an Organic Landscape in itself, which identifies with the forestry around and reflects the tribal state of Jharkhand’s landscape famous for its beautiful waterfalls, lakes and hills. The built mass on the site is designed in such a way that it seems to be emerging from this landscape setting announcing the arrival of the state as a new hub for technical advancements.


Front View

The plethora of World Class Sports Facilities within one large complex is planned in such a way that there is excellent connectivity between each sporting facility. The entire complex is planned around the main central axis with promenade to facilitate pedestrian movement and 100-ft wide road to allow smooth flow of all kinds of vehicular traffic.

SALIENT FEATURES...

  • Providing Centrally Air conditioned System for all stadiums.

  • The systems shall have Low operation and maintenance cost.

  • Separate plants for Main Athletic stadium, Indoor operational independence of the system.

  • De centralised plant using Air cooled Package unit system for the open air stadiums to enhance their independence.

  • Careful selection of indoor air conditioning system to achieve low noise and to suit the architectural requirement.

  • It provides a complete hands free operation of the main A.C plant. This will work like a Plant Manager, operating all equipments as per the requirement.

  • It will automatically change the operation of main chiller from cooling to freezing mode to charge the ice at night for the next days use.

  • Switching ON/OFF of all the pumps as per the time table for each building.

  • Starting/stopping of AHUs as per the operating schedule.

  • Providing Audio/Visual alarm in case of breakdown.

  • Providing the status of each filter and providing alarm when it is dirty, so to enable the Plant operator to get the routine cleaning.

  • Operational control and status of electrical systems.

  • Operational control and status of Fire fighting systems.

  • Control of lifts operations, etc


Top View

ELECTRICAL

  • Modern and Energy efficient system confirming to Latest IS and IEEE standards.

  • Decentralised electrical distribution system to reduce the operation and maintenance.

  • Air cooled Transformers.

  • Design of Emergency Power backup System.

  • Separate D.G sets for different zones

  • Use of Programmable logic Controller for simultaneous and oath operation of D.G sets.

  • Provision of high Mast Lights of required sizes for Day& Night matches in stadiums.

  • Public operation system for open air stadiums, indoor stadiums and other multi purpose activities.

  • Provision of suitable electrical power points fixing electronic score boards, etc.

  • Provision of suitable Telephone points at various points.

  • External and internal electrification suited as per the interior and landscape layout.


Cross-Sectional View

SANITARY & PLUMBING

  • Designing of efficient sewerage and storm water disposal system conforming to relevant IS codes and plumbing handbook.

  • Designing of efficient sewerage treatment plant (STP) for the complete sports complex confirming to EPA standards.

  • Designing separate water pumping stations at suitable location to improve the operation and maintenance of the piping system.

  • Providing suitable portable water for drinking at various locations in stadiums, guest houses etc.

  • Providing non portable water for various services and sports activities.

  • Accordingly, designing of energy efficient pumping systems.

  • Designing of overhead and underground water storage tanks to suit the total requirement of the complex.

  • Designing of energy efficient hydro pneumatic pumping system for the filling of tanks.

  • Providing sufficient water taps in ground for general landscape irrigation purpose at regular interval of 30 m.

FIRE-FIGHTING

  • Designing of efficient fire fighting system for the complete stadiums confirming as per NBC codes and NFPA-6 standards.

  • Designing of suitable fire fighting system ,which includes sprinkler system, or Providing hose heels, etc. at various locations as guidelines for stadium design in NBC.

  • Designing of various pumping systems and its control with the other services or activities, etc.

 

TENSION STRUCTURE USING COMLITE ROOFING

  • Large span steel structure main arch span, up to 300 m.

  • Combination of two different structural systems, compression arch and tension bars attached to the upper sides of the steel arch and suspended from the steel tubular pylons.

    • The four pylons are each guided with tension bars into foundations.

    • Every pylon is strategilly located at concrete staircase structures

    • The weight of concrete is used to balance uplift from the tension bars, reducing overall foundation cost.

  • Overall weight of steel estimated 60 kg/m for complete roof structure

 


TENSION STRUCTURE USING COMLITE ROOFING

  • Simple and economical steel structures.

  • Large span brought under control structurally by means of the suspended structure applied using pylons.

  • Tension bars fan out from the head of the pylon to the suspension points of main roof girders and are anchored to the foundations.

  • The entire open roof steel structure is composed of tubular profiles. The tubular profiles are to be welded airtight.

  • Material used high strength steel (fy=460 mpa) and pre-tensioned steel bars.

 

 

Gymnastic, Judo, Wrestling, Weightlifting, Taekwondo, Fencing & Boxing
Alternate Design  : Prefab Roofing Memebrane System

Use prefabricated lightweight woven electrical grade fiber glass substrate with Teflon pate coating.
Entire roofing of all the stadia can be pre engineered & put in place within days.
 

Some international stadiums covered by membranes:

  • Olympic stadium, Sydney.

  • King Fahd International Stadium, Riyadh.

  • Track & Field Stadium, Hiroshima

  • Olympic Stadium, Rome.

  • Also proposed in India for the first time at International Cricket Stadium at Raipur.


ENTRANCE & CIRCULATION


The admin. building is planned as an entrance portal to the sports complex. The central axis starts through this and culminates into a roundabout. Here, the visual corridor continues, opening views to the forest. Access to individual building with VIP drop-off points is provided at every facility. A ceremonial entrance is made possible at the main athletic stadium

 

 

 

 